Location

Birmingham

Services

N/A

Size

84 m2

Project Length

6 weeks

The Brief

To provide a design and build school expansion solution encompassing an early learning centre and Library facility. It was vital that this linked to the existing school.

Lea Forest Primary Academy

The Solution

The Qube designed a stand-alone building with enough space for a new early learning centre and library. The building was positioned approximately 5 metres away from the existing school and therefore needed a link corridor from the existing building to the new Qube.

The Outcome

The clients exacting requirements were met. The Qube provided a turn-key solution and managed all phases of the build programme. The design/build system used ensured there was minimal time on-site and therefore little disruption to the school.