Location
Essex
Services
N/A
Size
280 m2
Project Length
10 weeks
The Brief
To provide extra space for 3 separate classrooms and toilets with a link corridor to the existing school.

The Solution
The Qube proposed and executed a design and build package which allowed a modular unit to be built on-site, with minimal disruption to the school.
The Outcome
A new extension with a seamless transition into the school’s existing building. The new space has allowed the school to accept more children and the teachers and children love their new learning spaces.


